
Trails of Ashford Apartments
Phased interior strip-out across 512 occupied units ahead of full renovation. Unit turns scheduled around resident relocations. Dust enclosures and noise mitigation built into every unit plan.

Pillars of Seven self-performs selective and interior demolition across Texas — tenant improvement strip-outs, gut renovations, structural openings with engineered shoring, and surgical demolition in fully occupied buildings.
Every project is planned around the people still using the building. Dust controls, noise mitigation, after-hours scheduling, and protective enclosures are built into the plan before a single sledge swings.
Six selective demolition capabilities — each one self-performed by Pillars of Seven crews with the right equipment, dust controls, and the experience to work around live tenants.
Office, retail, and medical TI strip-outs to shell condition. Walls, ceilings, flooring, MEP rough-in, and finishes removed. Lease-commencement schedules met without surprises.
Surgical removal in buildings that are still 100% operational. Dust enclosures, negative-air machines, noise mitigation, and access control built into the plan before mobilization.
New openings in load-bearing walls, slabs, and decks — coordinated with a structural engineer of record. Engineered shoring designed, installed, and inspected before any cuts begin.
Night, weekend, and phased demolition for projects that cannot disrupt operations. Crews sized to compressed windows, debris removed continuously, site reset for next-day occupancy.
Targeted removal of specific elements — plaster ceilings, tile floors, partition walls, MEP equipment — while leaving adjacent finishes and structure fully intact.
ICRA-Class III and IV demolition in operating medical facilities. Anteroom enclosures, HEPA filtration, sealed waste paths, and infection-prevention coordination with hospital teams.

Five stages built around how building owners actually operate — survey the conditions, engineer the shoring, set the dust controls, work the phases, hand over a clean shell.
On-site walk with the property manager, existing-condition documentation, tenant impact mapping, hazmat screening referral where required, and scope confirmation.
Itemized estimate plus a phasing plan, dust-control plan, and structural engineering for any load-bearing or shoring scope. Alternates flagged for owner review.
Demolition permits pulled, tenant notifications sent, dust enclosures built, negative-air machines staged, and after-hours access coordinated with building management.
Self-perform crews work the phased schedule — nights, weekends, or daytime as the plan calls for. Continuous debris removal keeps each phase site-ready for the next morning.
Disposal manifests filed, recycling documentation provided when requested, final cleanup, and shell condition turned over ready for the next trade or tenant.
Three representative selective demolition engagements — scope, location, and outcome. Full portfolio and references available on request.

Phased interior strip-out across 512 occupied units ahead of full renovation. Unit turns scheduled around resident relocations. Dust enclosures and noise mitigation built into every unit plan.

Selective interior demolition across 388 units in an occupied 1967-vintage community. Kitchens, baths, and finishes stripped to substrate while neighboring units remained fully occupied.

Phased selective demolition across a 240-unit two-property portfolio. Coordinated with property management to maintain occupancy during the renovation cycle. Engineered openings for new bathroom layouts.
They built the dust enclosures, ran nights and weekends, and stripped six floors around tenants who never knew we were working. Zero tenant complaints across the entire build.
If your question isn't below, call (832) 548-0660 or request a quote. We respond inside one business day.
Tell us about the building, the tenants, and the schedule. We'll come back inside one business day with a phasing plan and preliminary estimate.